Shinjuku Sumitomo Building
Reborn Project Overview
| Location | 2-6 Nishi-Shinjuku, Shinjuku Ward, Tokyo |
|---|---|
| ARCHITECT | Sumitomo Realty & Development Co., Ltd. |
| Basic Concept / General Supervision | Sumitomo Realty & Development Co., Ltd. |
| SITE AREA | 14,446.46㎡ |
| Total floor area | 180,195.16㎡ |
| Structure | Steel-frame construction; partially reinforced concrete construction; partially steel-reinforced concrete construction |
| Number of Stories and Maximum Height | 4 basement levels to 54 above-ground floors (3 penthouse floors) 211.355 m |
| Construction Period | July 2018–June 2020 |
| History of Urban Planning | 1971: Designation of a Specific Urban Planning District 2016: Amendment to the Urban Plan (Construction of the Atrium) |
| Design Supervision | Nikken Sekkei Ltd. (Preliminary Design, Detailed Design, Construction Supervision) Taisei Corporation (Detailed Design, Construction Supervision) |
| Lighting Design | Okayasu Izumi Lighting Design Office, Inc. |
| Hall Consulting | Theater Workshop, Inc. |
| Construction | Taisei Corporation |
| INFO | National Strategic Special Zones / Designated Neighborhoods |